Tuesday, June 2, 2015

Hanging Day Today!

This is always an exciting day, the day that window treatments I've made are making their way into their new home.  Today I will be hanging two sets of panels.  One I shared with you in an earlier post, "My Next Sewing Project is Almost Done" and today I'll share the second pair.  Hopefully, by tonight I'll have pictures of them completed, hanging in their new locations. 

 
 These tab-top panels were given to my client and she wants to turn them into puddled panels that shir on a rod in the same fashion that the Living Room panels I made for her do, "Easy Floor To Ceiling Window Panels").  So, just how is that done?  It's pretty easy actually.  Here's a step-by-step look at what I did to "make it happen".

First things first, choose a coordinating fabric and buy enough fabric to get you to the added length you need plus seam allowances/hems.  My client wanted a red fabric for the accent fabric so I chose a fabric of similar texture and weight to the original panel.
 
Next, cut your new fabric to the necessary length and iron in your bottom hem, pinning as you go.  I did a double 2" hem in both the front fabric and the lining (cutting the lining roughly 1" shorter than the front fabric).


 Then, in order to attach your new fabric to the bottom of the old panel you'll need to separate the lining from the front fabric, just far enough up to allow you room to work.  (you can see I've already pinned my fabrics together, ignore the red, I got a little ahead of myself.  Just release the stitching roughly 2" above where you'll be stitching the two together).

Now, place your fabrics, right side together and stitch.  I used the old hem line as my guide.  When adding new fabrics to old and making two-tone panels I tend to use the 2/3 rule (don't know the technical name for it) I just know that the ratio is pleasing to the eye and it worked out perfectly to use the old hemline and add my new fabric right below it.  No extra marking or measuring.  After I sewed it on I simply cut off the old hem, ironed the seam between my newly sewn pieces and then ironed again from the front.  You're going to repeat the process for the lining.

You can barely see the old hem line along the fraying edge of the new red fabric
Here they are all sewn together.  Now it's time to fix the messy edges, and they usually are all kinds of wonky.

See what I mean, all kinds of Wonky!  It takes a little time and patience to blend these together, then iron them, giving you a nice, crisp edge (fold them in, doubling up the fabric to contain the cut edge).  Again, pinning as you go.  I did not capture the side seam stitching in pictures, all I do is hand stitch using a doubled thread from where I pulled out the original side seam to add the red fabric, all the way to the bottom hem, being careful not to go through to the front, only capture the lining.

Now, you should have completed panels, with the original tab-tops.  That's about to change.  I simply cut across that narrow stitched backing piece and removed the stitching along the tab side, as shown in the 2nd picture.
 
 I left the little other piece alone, it's gonna be covered anyhow.

I measured the diameter of the rod they'll be shirred on, added a couple inches to make it a little easier to shir and made a "pocket" of lining fabric.  You are looking at the back, top of the panel.  I will simply run a stitch along the top and bottom where my "pocket" is at and it's ready to go. 

 Here they are waiting for today, hanging day! 
 
Here's the second set that I'll also be hanging today.
 
  Stay tuned, more pictures coming soon.
 
 
 

Monday, June 1, 2015

My Bathroom is Begging for a Change

 
We built our house eight years ago.  The bathroom looks exactly as it did then.  I am ready for a change.  Nothing drastic,  I still like the foundation of the room.  I don't want to spend a lot, but a change is in order. 
 
Here's a look at the bathroom as it is now and a look into the changes I'm planning.  Decorating is a process so I'm sure things will change, but here's my plan.
 
 This is the view to the left, standing at the entry from the bedroom into the bathroom.  Directly across from this door is the door into the closet.  I have always wanted to paint or wallpaper above the tile-work but as you see, that hasn't happened.  It's about time don't you think?

I am also considering changing the window treatments.  I made these right after we moved in, never finished off the hem of the roman shade and wanted to add some trim (I love trim).  Again, hasn't happened yet.  Depending on what I do with the rest of the space will determine my decision for the windows.  Hmmm!  I'm considering using that scarf as a valance and just putting a film on the window to let us see out but others not see in. 

Stenciling is also an option.  I took a look around but am not impressed with what I've seen in stores.  While sitting here writing this I see a roll of paper and am thinking, "what an awesome pattern".  I could make my own stencil, lightbulb moment!






This is the view into the right side of the room.  I still like all the structural pieces and my tile-work.  Just want to add a little something with paint or wallpaper to finish it off.

A few accessories and it'll be good to go.






That's the closet door I spoke about earlier.  I am also contemplating painting the doors.  I love the look of painted doors but not sure my husband would go for that.  I'll get everything else done and then re-consider.
Adding some paint, stenciling or wallpaper above the tile will completely change the look of the room.  Not sure if I'll keep it neutral or jazz it up with some color.  Decisions, decisions.

I have chosen a wall color for the bedroom so I need to get that painted first and then build off of it.  I would like to contrast.  Stay tuned for the end result.  I'm really excited to be taking some baby steps and making some changes around here.  Eight years is a long time.  Bring on some change!

Thursday, May 28, 2015

Our First Project Of The Season

When I left you last, the new deck was almost ready for decking.  Now, the decking is on and it looks fabulous.  Hubby is doing a great job!


We had a couple days of rain where he really couldn't work outside too much so he spent that time planning and prepping.  He planned the decking out on paper and got much of the cutting done and laid out in the garage. 


 
We are using IPE Wood for the decking material.  It is a really hard wood and lasts much longer than other decking materials, and the best part, I don't have to stain/seal it every year.  That was a major selling point for me. 
 
The Cedar posts are here as well and the rebar for the railing. 
 
 It has been quite the adventure and we're at the final stage, can't wait to see the railings go up.  Hubby is working on the water dispersal system as well, it'll be metal but not sure if we're going to let it rust or have it coated?  We both like the rusted, aged metal look but there is going to be an overhang and not sure we want it dripping onto the concrete patio below.  Not sure what he'll decide on that one.



This area underneath is where an outdoor kitchen will eventually go.  That's going to be a fun project too.  Not sure when that'll get started?
 
Stay tuned!  Railings and water dispersal are coming up next.
 
 

Wednesday, May 27, 2015

Happenings in the Garden

Take a walk with me through the gardens:
 
Primrose is blooming beautiful and the Knockout Roses are all budded out. 
 
 This is going to be full of Purple Coneflowers.  I can't wait for them to start blooming.  The birds deposited all kinds of seeds in the front bed between the walkway and the stone wall and the back area between the purple bush (can't remember if it's a cherry or plum) and the crab apple tree is full as well.  It's going to be gorgeous when in bloom.
 
 I bought two of these clearance roses last year at Home Depot, lost one but this one is happy, happy!
 
Siberian Iris popping at the seams.  I really need to divide them but man, is that a job.  Last time I had to use an axe to get them divided after digging some out, which was not an easy task.  It's exhausting.  Some day it'll have to happen, probably not this season.
 
 
 One of the berms out front is having some bug issues.  I haven't sprayed yet but I'm going to have to.  This plant is a purple coneflower, yet its pretty much unrecognizable and completely eaten. 
 
Here's one of the little buggers.  This is another plant in the same flowerbed, at the opposite end.  Gotta get rid of these critters before they completely destroy this bed and move on to another.
 
 
 It seems a little early but I've got a few Purple Coneflowers already in bloom.
 
We also got the "water works" up and running this weekend.  I just love the sound of running water.
 
 
I know I've said it before and I probably will again and again, but I just love perennials.  I like for my gardens to kind of "sprawl" all over.  Not so orderly and I tend to let them grow wherever they pop up.  Here's another example of "babies" that I'm just gonna let grow and fill in.  I almost pulled them while weeding until I realized, "I think that's a balloon flower" and sure enough, I've got a handful of babies popping up in my front flowerbed.  Thank you little birdies!
 

Tuesday, May 26, 2015

Dog In The Yard, Oh No!


Miss Pepper is absolutely terrorizing my poor yard.  She loves to run through the flowerbeds, chew off branches, play keep away with the bushes, hiding her toy somewhere within its branches, then pouncing on it to re-claim her prize.  Crazy dog has really done a number on my yard.
 
Hoping to get a fence going sometime this season to give her access to the lake (so she can cool off when she needs to) and give her plenty of space to run, without doing figure eights through my flowerbed flinging mulch in all directions as she goes.
 
See those bare spots at the bottom of this bush.  I couldn't figure out why the limbs were turning brown and dying until I went a little closer.  Crazy dog has chewed off many of the lower branches.  She "plays" with the bush, using it to hide her toys.  I guess those bottom branches get in her way because she has systematically removed them all.
 
 Here's just a few of the branches.  There are three of these bushes and she runs through them, over them (straight into them at times) and has cleared herself a nice little running path.  I've never had a dog be so destructive in my landscaping, I am really surprised at how good things actually look because she's been just a tad hard on them.
 
 Here's one of my grasses that she hasn't destroyed yet but this is a perfect example of what she does with her "toys".  Yes, it's a sock, she steals them all the time and plants them in the bushes or grass and then proceeds to "attack" them, doing a number on the plant while she's at it.
 
 This is one of her favorites.  Normally, this is a beautiful grass, full and beautiful.  Not this year!
 
She LOVES Knockout Roses, go figure.  I've chopped them off at the ground before and they always come back but look at how she chews them off.  I was sure she'd killed this one.  All that gnawing was bound to let some type of disease in or kill off the plant somehow.  Shockingly enough, that rose is beautiful this year. 
 
 
 One final example of this crazy dog's love for my flowers:  
This is an indoor plant that she "nibbled" on.  Chewed off a huge beautiful limb.  I was so mad at her, but look at what it's doing, new baby limbs are sprouting out.  Wow!  Maybe she needs to chew off a limb every once in a while.
 
  I am hoping a larger space will help dissuade her and I'm sure a little training would be a good thing but really, I'd rather move it all and give her the yard than spend time trying to keep her out of it.  Lazy, yes, but there are so many other things to do in a day and so many other training needs that this one, really, is the least of my worries.  Now, if the fence, which will allow her access to all the rest of my flowerbeds, doesn't dissuade her and she rips into them, that might change my mind.
 
Does your dog do things like this in your yard?  How do you handle it?
 

Sunday, May 24, 2015

Tiling is Underway, Yeah!

 
Today, if all goes well, will be my last day tiling in the shower.  We can then get the glass surround people in for some measurements and get the shower up and running.  Not sure if the floor is next or the vanity area, but for now, let's just concentrate on the shower.

Here's a reminder of what I started with:

First step, a friend of the family who's a plumber came in and demo'd the wall on the right into a half-wall, removing the shower plumbing and running it into the left wall.  He also had to deal with a vent that ran through the end of the wall out in the room.  Done! 
 
He placed the shower basin and prepped with Durock.  Now it's my turn.
 
Tile shopping is so much fun.  There are so many great tiles to choose from and I love putting it all together and coming up with a design.  We shopped only box stores (we took a look at a high end tile shop but wowzer, gorgeous stuff but really expensive!)
 
The mosaic tile is a "knock-off" of an expensive tile that we really loved, but half the price.  This one will look great.  After our day of shopping I got a call that they'd like to incorporate the expensive in the shower only and still use this one everywhere else we had planned.  Not a problem, they should blend together nicely since they won't be right next to one another.
 
 Here are a couple layouts I was playing with to decide what I wanted to do.  I really thought I'd love the right picture using full tiles but I also want three stripes and the proportions are all off to do that.  So, second attempt (on the left) with slightly more than half a tile for the accent it is.  Perfect!  It's going to look fabulous!




First step is to mud and tape the seams as well as the screw holes in the durock.  I've also got a board at the bottom, one tile up, as a support.  The bottom row will go on later.
 Day one:
  Feel like I got nothing done, lots of prepwork.
 Day two:
  I only worked about 4 hours today. 
 
Day3:
We are now ready Superior Home Products to come in, measure and get working on the glass door and surround  (as well as a countertop).  I was short one mosaic tile to finish up on the right edge and a have a TON of clean-up work to do but at least we can keep the ball rolling.
 One of the many little problems that popped up:  You can't really see this little half wall from the entry and we didn't want to waste the expensive mosaic so we opted to not use it on this wall but I still wanted my tile runs to line up.  So, I went and found a 6x6 and we are using it in place of the mosaic and as a topper.  It'll also run along the outer edge of the wall (finished edges on both sides so it'll finish it off nicely, without spending the extra money for corners, why spend it if you don't have to?)
 
If you could tile your dream shower what would it look like?
Related Posts Plugin for WordPress, Blogger...